Table 3-3.  M&O contractor site environmental surveillance program summary (2002).

 

 

Locations and Frequency

Minimum Detectable Concentration

Medium Sampled

Type of Analysis

Onsite

Offsite

Air (low volume)

Gross alpha

13 weekly

4 weekly

1 x 10-15 μCi/mL

 

Gross beta

13 weekly

4 weekly

5 x 10-15 μCi/mL

 

Specific gamma

13 quarterly

4 quarterly

a

 

238Pu

13 quarterly

4 quarterly

2 x 10-18 μCi/mL

 

241Am

13 quarterly

4 quarterly

2 x 10-18 μCi/mL

 

90Sr

13 quarterly

4 quarterly

2 x 10-14 μCi/mL

 

Particulate matter

13 quarterly

4 quarterly

10 μg/m3

Air

(atmospheric moisture)

Tritium

2 to 4 per quarter

2 to 4 per quarter

1 x 10-11 μCi/mL (water)

Air

Nitrogen oxides

Continuous

b

NAc

Air

Sulfur dioxide

Continuous

NA

Soil

Specific gamma

Varies annuallyd

0.1 pCi/g

 

Pu isotopes

Varies annually

0.003 pCi/g

 

241Am

Varies annually

0.003 pCi/g

 

90Sr

Varies annually

0.06 pCi/g

Vegetation

Specific gamma

Varies annuallyd

1 x 10-7 μCi/g

 

238Pu

Varies annually

1.2 x 10-8 μCi/g

 

239/240Pu

Varies annually

6 x 10-10 μCi/g

 

241Am

Varies annually

1.2 x 10-8 μCi/g

 

90Sr

Varies annually

1.2 x 10-8 μCi/g

Drinking Water

Gross alpha

12 quarterly

1 pCi/L

 

Gross beta

12 quarterly

4 pCi/L

 

Tritium

12 quarterly

1,000 pCi/L

 

90Sr

4 quarterly

2 pCi/L

 

Other radionuclides

12 quarterly

a

 

Volatile organics

10 annually/ 4 quarterly

0.5 ppb

 

Semivolatile organics

12 triennially

0.5 ppb

 

Inorganics

12 triennially

0.5 ppb

Direct Radiation Exposure (TLDs)

Ionizing radiation

135 semiannually

13 semiannually

5 mR

Direct Radiation Exposure

(mobile radiation surveys)

Gamma radiation

Facilities and

INEEL roadse

NA

a.     Minimum detectable concentration for gamma spectroscopic analyses varies depending on radionuclide.

b.     Denotes that the M&O contractor does not collect samples from offsite locations for this parameter.

c.     NA = not applicable.  This information is recorded as an instrument reading at the time of inspection.

d.     Onsite soil sampling is performed each year at different onsite facilities on a rotating two-year schedule.

e.     Surveys are performed each year at different onsite facilities on a rotating three-year schedule.  All INEEL roadways over which waste is transported are surveyed annually.